问题描述
当前,我正在使用AX 2009,并且有一种情况,
制成品:Z = 10个
原材料:A = 10个
操作:P,Q
当我用原材料"A"生产成品"Z"时,操作(P,Q)和质量技术人员发现成品中存在一些设计差异,然后根据质量反馈,我们进行返工.在返工中,我们必须再次生成物料请求,并且还必须运行两个操作.
因此,我需要有关AX 2009中生产订单返工功能的信息.
在此先感谢.
Hi,
Currently I am using AX 2009, and I have one scenario as,
Finished Good: Z = 10 pcs
Raw Material: A = 10 pcs
Operations: P, Q
When I produce finished good "Z" with Raw Material "A" and Operation (P,Q) and Quality technical found some design differences in the finished good then on basis of the quality feedback, we go for rework. In rework, we have to generate material request again and also we have to run the two operation.
So, I need information about functionality of production order rework in AX 2009.
Thanks in Advance.