问题描述
正如标题应该建议的那样,每当列表A中的列表项被更改时,我都会尝试让SharePoint自动更新
列表B 项目。
在这种情况下,当在 List A 中创建项目时,它还会在列表B中创建一个具有相同列的项目( List B
还有其他专栏)。这是通过SharePoint Designer 2013中的工作流完成的,并且运行正常。
两者列出A 和列表B 有一个名为Notes的列。我想要发生的是当列表A
中的相应Notes字段收到值时,
列表B 中的Notes字段将被更新(用户输入一个注释)。
看起来这应该是世界上最简单的工作流程,但我尝试了很多不同的方法来做到这一点我仍然无法将工作流程更新为
列表B 。请帮助!
As the title should suggest, I'm trying to get SharePoint to automatically updateList B item whenever a list item in List A is changed.
In this case, when an item is created in List A it also creates an item in List B with some of the same columns (List Balso has other columns). This was done with a workflow in SharePoint Designer 2013 and works just fine.
Both List A and List B have a column called Notes. What I would like to happen is for the Notes field inList B to be updated when the corresponding Notes field in List A receives a value (user enters a note).
It seems like this should be the easiest workflow in the world to make, but I have tried a bunch of different ways to do this and I still can't my workflow to make the update toList B. Please help!
推荐答案
这篇关于根据主列表项更改更新辅助列表项的文章就介绍到这了,希望我们推荐的答案对大家有所帮助,也希望大家多多支持!